-
Design, engineering and construction of Toheed tunnelwith 2136 m length in 30 months (remarkable project time record)
-
Largest Tehran municipal tunnel project
-
Utilization of prefabricated concrete segments for
facade, interior walls and Toheed Tunnel ramps
-
Construction of ressalat tunnel and driving it underVali-Asr Street and main gas pipes.
-
The first transport tunnel in Tehran
-
Construction of Eghlid tunnel with 2610 mlength and no fatal accidents or injuries
-
One of the longest inter-city transport tunnel in Iran